Repository navigation
docs: Platform security plan for ML2 - #3512
Open
janis-qorix wants to merge 2 commits into
Open
janis-qorix wants to merge 2 commits into
janis-qorix wants to merge 2 commits into
Conversation
- Decision on the cybersecurity assessment with its risk-based rationale, the independent review and the assessor. - Security audit before the maturity level 3 assessment; formal security reviews by an "external" security manager from the pool. - Tailoring list corrected; clause table for the clauses that are not fully in the platform's scope. - Cybersecurity interface with the integrator (ISO/SAE 21434 RQ-07-04). - Vulnerability management plan: sources, triggers and the incident response plan per incident. - Work product table with the status of each work product. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
janis-qorix
requested review from
PandaeDo,
aschemmel-tech,
masc2023 and
pahmann
as code owners
November 20, 2026 16:39
Contributor
|
Documentation preview for this pull request is available at: |
masc2023
requested changes
Nov 20, 2026
masc2023
left a comment
Contributor
There was a problem hiding this comment.
First process description PR must be discussed
Following the review of eclipse-score/process_description#891 and eclipse-score/process_description#892, the tailoring of ISO/SAE 21434 stays as in the process description: - cybersecurity assessment tailored out, as also no finalized cybersecurity case is planned (WP-06-03, clause 6.4.8) - damage scenarios, impact ratings, risk values and risk treatment decisions tailored out, as they depend on the item (WP-15-01, WP-15-04, WP-15-07, WP-15-08, RQ-15-15 to RQ-15-17); the platform analyses assets, threat scenarios, attack paths and feasibility - tailoring list in the structure of the safety plan; assets and threat scenarios are no longer listed as integrator work products - formal security reviews and security audit as on main - clause table and cybersecurity interface removed: clauses 7, 9, 11, 12 and 14 stay not relevant, as on the standards page - incident response and the new process work products removed; the sources and triggers of the monitoring stay Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This branch has not been deployed
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Platform security plan in
scorefor ML 2, aligned with the current state of eclipse-score/process_description#891 and eclipse-score/process_description#892: the tailoring of ISO/SAE 21434 stays as in the process description, the tailoring list is written in the structure of the safety plan, and the work product table shows the real status.Changes
gd_guidl__security_tailored), analogous to the safety plangd_guidl__security_analysis_tailored)Formal security reviews and the security audit are unchanged compared to
main.Related ticket
Relates to eclipse-score/process_description#441 and eclipse-score/process_description#452 (no separate score ticket).
Dependency
scoreuses the released process description (score_process_description2.2.4). The clause 6.4.8 requirements (std_req__isosae21434__prj_management_6481to6489) are therefore written as literals; they become links when the dependency is updated after eclipse-score/process_description#891 is released.Other PRs in this series
AI: Claude Code. First version with Claude Haiku 5.5 (claude-haiku-5-5), reviewed and revised with Claude Opus 5.5 (claude-opus-5-5).
🤖 Generated with Claude Code