Skip to content

docs: Platform security plan for ML2 - #3512

Open
janis-qorix wants to merge 2 commits into
eclipse-score:mainfrom
qorix-group:ml2-security-plan-upstream
Open

janis-qorix wants to merge 2 commits into
eclipse-score:mainfrom
qorix-group:ml2-security-plan-upstream

Conversation

@janis-qorix

@janis-qorix janis-qorix commented Nov 20, 2026 •

Copy link
Copy Markdown
Contributor

Summary

Platform security plan in score for ML 2, aligned with the current state of eclipse-score/process_description#891 and eclipse-score/process_description#892: the tailoring of ISO/SAE 21434 stays as in the process description, the tailoring list is written in the structure of the safety plan, and the work product table shows the real status.

Changes

# Change Basis
1 Cybersecurity assessment tailored out, as also no finalized cybersecurity case is planned: WP-06-03 and the requirements of clause 6.4.8 (RQ-06-24 to RQ-06-32). #891 (gd_guidl__security_tailored), analogous to the safety plan
2 Clause 15 scope: damage scenarios, impact ratings, risk values and risk treatment decisions are tailored out, as they depend on the item (WP-15-01, WP-15-04, WP-15-07, WP-15-08, RQ-15-15 to RQ-15-17). The platform analyses assets, threat scenarios, attack paths and attack feasibility. #892 (gd_guidl__security_analysis_tailored)
3 Tailoring list corrected: assets (WP-15-02) and threat scenarios (WP-15-03) are no longer listed as integrator work products, as the platform security analysis produces them; the duplicate entry of WP-05-01 is removed. process work products
4 Clauses 7, 9, 11, 12 and 14 stay not relevant, as on the standards page of the process description. standards page
5 Vulnerability management plan: the identification channels are the sources of cybersecurity information (RQ-08-01); new triggers section (RQ-08-02, RQ-08-03). #891, security plan checklist item 16
6 Work product table: status of each work product. —

Formal security reviews and the security audit are unchanged compared to main.

Related ticket

Relates to eclipse-score/process_description#441 and eclipse-score/process_description#452 (no separate score ticket).

Dependency

score uses the released process description (score_process_description 2.2.4). The clause 6.4.8 requirements (std_req__isosae21434__prj_management_6481 to 6489) are therefore written as literals; they become links when the dependency is updated after eclipse-score/process_description#891 is released.

Other PRs in this series

AI: Claude Code. First version with Claude Haiku 5.5 (claude-haiku-5-5), reviewed and revised with Claude Opus 5.5 (claude-opus-5-5).

🤖 Generated with Claude Code

- Decision on the cybersecurity assessment with its risk-based
  rationale, the independent review and the assessor.
- Security audit before the maturity level 3 assessment; formal
  security reviews by an "external" security manager from the pool.
- Tailoring list corrected; clause table for the clauses that are not
  fully in the platform's scope.
- Cybersecurity interface with the integrator (ISO/SAE 21434 RQ-07-04).
- Vulnerability management plan: sources, triggers and the incident
  response plan per incident.
- Work product table with the status of each work product.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@github-actions

Copy link
Copy Markdown
Contributor

Documentation preview for this pull request is available at:
pr-3512: https://eclipse-score.github.io/score/pr-3512/

@masc2023 masc2023 left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

First process description PR must be discussed

Following the review of eclipse-score/process_description#891 and
eclipse-score/process_description#892, the tailoring of ISO/SAE 21434
stays as in the process description:

- cybersecurity assessment tailored out, as also no finalized
  cybersecurity case is planned (WP-06-03, clause 6.4.8)
- damage scenarios, impact ratings, risk values and risk treatment
  decisions tailored out, as they depend on the item (WP-15-01,
  WP-15-04, WP-15-07, WP-15-08, RQ-15-15 to RQ-15-17); the platform
  analyses assets, threat scenarios, attack paths and feasibility
- tailoring list in the structure of the safety plan; assets and
  threat scenarios are no longer listed as integrator work products
- formal security reviews and security audit as on main
- clause table and cybersecurity interface removed: clauses 7, 9, 11,
  12 and 14 stay not relevant, as on the standards page
- incident response and the new process work products removed; the
  sources and triggers of the monitoring stay

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

Status: Backlog
Status: No status

Development

Successfully merging this pull request may close these issues.

2 participants