Repository navigation
Description
Is there an existing issue for this?
- I have searched the existing issues
Current behavior
API Allows Archiving a Non-completed Work Item by Updating archived_at
Environment
- Plane version: v1.3.0
- Deployment: self-hosted
- API path tested:
/api/v1/workspaces/{workspace_slug}/projects/{project_id}/work-items/{work_item_id}/
Summary
We observed a behavior difference between the Plane Web UI and the API when archiving a work item.
In the Web UI, the archive action shows the following message for a work item that is not completed or canceled:
Only completed or canceled work items can be archived
However, using the API, we were able to archive a work item that was still in a non-completed state by updating the archived_at field directly.
We would like to confirm whether this is expected behavior or a bug.
Steps to Reproduce
- Create a work item.
- Keep the work item in a non-completed and non-canceled state, such as
TodoorIn Progress. - Open the work item in the Web UI and check the archive action.
- The Web UI indicates that only completed or canceled work items can be archived.
- Send a PATCH request to the work item API:
curl -X PATCH \
"$PLANE_HOST/api/v1/workspaces/$WORKSPACE_SLUG/projects/$PROJECT_ID/work-items/$WORK_ITEM_ID/" \
-H "x-api-key: $PLANE_API_KEY" \
-H "content-type: application/json" \
-d '{"archived_at":"2026-05-22"}'Observed Result
The API request returned 200 OK.
The work item was archived even though it was not in a completed or canceled state.
Expected Clarification
Could the Plane team confirm which behavior is expected?
- Should the API allow
archived_atto be updated directly regardless of the current work item state? - Or should the API follow the same rule shown in the Web UI, where only completed or canceled work items can be archived?
Additional Observation
We also tried the following path:
POST /api/v1/workspaces/{workspace_slug}/projects/{project_id}/work-items/{work_item_id}/archive/
It returned:
{"error": "Page not found."}So the behavior described above was observed through PATCHing archived_at on the work item resource.
Steps to reproduce
Steps to Reproduce
- Create a work item.
- Keep the work item in a non-completed and non-canceled state, such as
TodoorIn Progress. - Open the work item in the Web UI and check the archive action.
- The Web UI indicates that only completed or canceled work items can be archived.
- Send a PATCH request to the work item API:
curl -X PATCH \
"$PLANE_HOST/api/v1/workspaces/$WORKSPACE_SLUG/projects/$PROJECT_ID/work-items/$WORK_ITEM_ID/" \
-H "x-api-key: $PLANE_API_KEY" \
-H "content-type: application/json" \
-d '{"archived_at":"2026-05-22"}'Observed Result
The API request returned 200 OK.
The work item was archived even though it was not in a completed or canceled state.
Environment
Production
Browser
Google Chrome
Variant
Local
Version
v1.30.0
Activity
makeplane commentedon May 22, 2026
Synced with Plane Workspace 🔄
[GIT-205] [bug]: API allows archiving non-completed/non-canceled work items by PATCHing archived_at
praneeth-7606 commentedon Sep 25, 2026
Reproduced -- the external API accepts
archived_atas a writable field, so it bypasses the completed/cancelled state-group check enforced by thearchiveandbulk-archive-issuesendpoints.I'm fixing this with server-side validation in the work item serializers (both the external API
IssueSerializerand the appIssueCreateSerializer), using the same rule and error message as the existing archive endpoints, plus contract + unit tests. PR coming shortly.On the second point (
POST .../work-items/{id}/archive/returning 404): this PR only closes the validation hole. Adding dedicatedarchive/unarchiveendpoints to the external API would be a new feature -- happy to open a separate proposal for that if the maintainers want it.fix(api): reject archiving non-completed or non-cancelled work items
fix(api): reject archiving non-completed or non-cancelled work items
fix(api): port upstream Plane fixes for the public v1 API (#45)