Skip to content

1.13 CI: integration-test lane flag is inert (full suite runs 12x per PR) and sonar dies on the missing cache-ui-dist action #32760

Open

Description

@manerow

Affected module

CI (Java integration-test lanes and SonarCloud job on the 1.13 release branch)

Describe the bug

Pull-request checks run under pull_request_target, so every PR that targets 1.13 executes the workflow files from main against a 1.13 source tree. Two pieces of main's CI machinery have no counterpart on 1.13, and together they make almost every 1.13 backport red for reasons unrelated to the PR:

  1. The integration-test lane matrix is inert. main's IT workflows call mvn verify -DintegrationTests.lane=<parallel|global-state|multi-node|retry-queue>, but the integration-lane-* profiles (Fixes 30119: Stabilize integration-test CI #30120) never reached 1.13's openmetadata-integration-tests/pom.xml. The property is ignored, so each of the four lanes runs both failsafe executions, that is the full suite. Measured on Backport #32181 to 1.13: stop pipeline alerts firing for historical and re-ingested executions #32590: all four lanes reported exactly the same count per db/search combo (mysql-elasticsearch 12746, postgres-opensearch 12762, postgres-elasticsearch-redis 12768), and the parallel lane log shows both sequential-tests (143) and parallel-tests (12519) ran. On main the same lanes partition into 169 / 20 / 15703 / 35 tests. A 1.13 push therefore executes the full parallel suite 12 times instead of 3, and a single flaky test in any of the 12 fails a required check. Over five pushes and attempts on Backport #32181 to 1.13: stop pipeline alerts firing for historical and re-ingested executions #32590 the failing test was different every time (glossary reviewer race, UserMetricsResourceIT, ListEntityHistoryByTimestampPaginationTest twice, a container timeout), while the same commit was green on 2.0.

  2. maven-sonarcloud-ci fails in about 45 seconds on every 1.13 PR with Can't find 'action.yml' ... under '.github/actions/cache-ui-dist'. main's maven-sonar-build.yml uses that composite action (perf(ui-build): cache openmetadata-ui dist across workflows #30700); the action directory does not exist on 1.13, and the job checks out the PR head. Build with Maven is skipped, so nothing is compiled or analysed. Reproduces on Backport #32350 to 1.13: emit ChangeEvents for bulk entity updates #32536, Fixes #25847: Include bot user in bot list responses [1.13] #32522, Backport #32181 to 1.13: stop pipeline alerts firing for historical and re-ingested executions #32590.

To Reproduce

  1. Open any PR with a Java change against 1.13 and add safe to test.
  2. Compare the Integration Test Report (mysql-elasticsearch, <lane>) check titles: all four lanes show the same "N tests run".
  3. Open the maven-sonarcloud-ci job: it fails at Restore openmetadata-ui dist cache before building.

Expected behavior

A 1.13 PR should run each integration test once per db/search combo, partitioned by lane exactly as on main, and the SonarCloud job should reach the Maven build.

Version

1.13 branch (1.13.6-SNAPSHOT), any PR since the lane matrix landed on main in #30120.

Activity

  1. added
    bug
    on Sep 6, 2026
  2. moved this to In Progress 🏗️ in Shippingon Sep 6, 2026
  3. added a commit that references this issue on Sep 7, 2026
    6322e28
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    bug

    Type

    No type

    Projects

    • Status
      In Progress 🏗️

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions