Skip to content

Fixes #35456: Approval task preview lists every change since its approval cycle began - #38857

Open
Vamsi-klu wants to merge 14 commits into
open-metadata:mainfrom
Vamsi-klu:fix/35456-approval-preview-from-history
Open

Vamsi-klu wants to merge 14 commits into
open-metadata:mainfrom
Vamsi-klu:fix/35456-approval-preview-from-history

Conversation

@Vamsi-klu

@Vamsi-klu Vamsi-klu commented Nov 26, 2026 •

Copy link
Copy Markdown
Contributor

Describe your changes:

Fixes #35456

The Proposed Changes card on an approval task now lists what the entity changed since its approval cycle began, recomputed from the version history every time the workflow writes the task.

The two exact repros in the issue already pass on main. Three changes fixed them on the way: #35972 strips the workflow's own status move from the preview, #37010 previews the edit that opened the cycle, and #32335 writes workflow fields with optimistic locking, so the status write is stored as its own version and no longer folded into the user's version (that folding is what the metric report on 2.0.5 shows). ITs 1 and 2 below pin both repros so they stay fixed.

What was still wrong is the shape of the preview itself. It was a running merge: each new task copied the map stored on the open task it superseded and added one change read off the entity when the task was created. Nothing ever recomputed it, so three things still went wrong on main:

  1. A wrong map carried from an earlier task, for example one stored before an upgrade, was copied into every later task of the cycle. A task whose only new change was the status move came out identical to the task before it, which is the first symptom in the issue.
  2. An edit that started no run never showed up. Bot edits start no run, and neither do edits the trigger filter skips, yet approving still accepts them and rejecting still rolls them back. Example: the ingestion bot edits a term's description while it is In Review, and the next task still shows the old description.
  3. With two open tasks to supersede, the map carried forward was whichever one the list returned first.

ITs 4 and 5 reproduce 1 and 2 and fail on main. RED run on the unfixed code:

ApprovalTaskPreviewIT on main (1971feb202 plus the test commit only)
Tests run: 6, Failures: 0, Errors: 2, Skipped: 0

aBotEditDuringTheCycleIsInTheNextPreview: ConditionTimeout after 3 minutes
  expected: {synonyms={removed=[], added=[Alias]}, description={removed=[Original definition], added=[Ingested definition]}}
  but was:  {synonyms={added=[Alias], removed=[]}, description={added=[Edited definition], removed=[Original definition]}}

aStalePreviewOnTheOpenTaskIsNotCarriedIntoTheNextTask: ConditionTimeout after 3 minutes
  expected: {synonyms={removed=[], added=[Alias]}, description={removed=[Original definition], added=[Edited definition]}}
  but was:  {synonyms={added=[Alias], removed=[]}}

Behavior after this change:

  • An approval task that is not a change request review or a lifecycle move previews the fold, oldest first, of the stored change of every version newer than the cycle's base version. It uses the same set cancellation as before, so an edit taken back within the cycle still cancels out, and the status is still left out (the record "An approval preview omits the workflow's own status move" still holds).
  • A successful rebuild replaces the stored preview. If the history read fails, the task opens with any carried entries and marks them as incomplete.
  • Edits that start no run appear in the next preview when they are newer than its baseline. This includes bot edits made before the workflow opens a task and fields the trigger excludes, with the workflow status omitted.
  • proposedChangesBaseVersion records where the cycle began. The opening task uses the earlier of the triggering edit's previous version and the latest approved version found in history. A task that supersedes or reenters uses the earliest triggering or carried base.
  • proposedChangesIncomplete marks failed reads and snapshot fallbacks. The Proposed Changes card and the default task-created notification both warn when the flag is set, even when there are no entries.
  • Change request reviews and lifecycle approvals are unchanged, with one edge: a change request run whose revision has no open changes left now keeps the preview it has, where before it fell back to the entity's latest change.

This supersedes the decision record "An approval preview opens with the edit that started the cycle" and adds a new record, "An approval preview lists the change since its cycle began". The direction still needs agreement from the decider of the record being superseded, who has been working in this same code recently (#38708, and #37901 is still open). The proposal is on the issue; I built the full change anyway so there is something concrete to look at, and I will rework it if the answer is no.

Type of change:

  • Bug fix

High level design:

New pieces, all in governance/workflows/util unless noted:

  • ApprovalCycleHistory reads the stored versions of the cycle. It starts from a fresh read of the entity and follows each change's recorded previous version, one stored row at a time, and stops at the base. It does not page listVersionsWithOffset, which the plan suggested: that query orders rows by their extension name as a string, so once an entity passes version 10.0 a page of "newest" rows starts at 9.9 and a walk that stops at the base would stop too early. Following the recorded previous version is the same link the server already relies on when it consolidates a session (getPreviousVersion). The walk reads up to 200 versions. If a row is missing or the cap prevents reaching the base, it compares the base and current versions when both are available and marks the result incomplete. This keeps the visible edits while warning that nested changes, such as a column's description, can be missing.
  • ApprovalCycle.baseVersion takes the earliest triggering or carried base. An opening task also considers the approved baseline using the same predicate as rollback.
  • ApprovedBaseline is the approved version predicate moved out of RollbackEntityImpl unchanged, so the preview and rollback agree on what counts as the last approval. RollbackEntityImpl now calls it; its tests pass unchanged.
  • TriggeringChange.baseVersion gives the version the triggering edit was made from.
  • ChangePreviewUtils gets foldChanges, withCyclePreview and cycleBaseOf. buildProposedChangesPayload is narrowed to the change request revision, and the old hop logic (pickIncrementalOrFull, the 2 and 4 argument overloads) is gone. preserveProposedChanges becomes preservePreviewState and carries the base key too.
  • CreateTask wires it in: the preview is computed lazily and only for the two approval task types, inside a FreshReadScope, and the prior open approvals are sorted oldest first instead of taking an arbitrary one.

Fallbacks for state from before the upgrade:

  • A carried task without the key, or a run without a triggering version, starts from the newest version a reviewer accepted (the rollback rule), else from the version before the latest change.
  • A task's own payload without the key, on the reentry path, starts from the version before the latest change.

Why a stored pointer and not a rule derived from the history alone: some workflows never write Approved (the custom table workflows in the ITs end without a status write), and when the requester's own approval write is consolidated the approval transition disappears from the history.

Alternatives I rejected: fixing which hop the running merge picks (still carries stale maps and still misses edits that started no run), recomputing on every task read (every GET and list would walk history, and notifications carry the stored payload), using snapshot diffs for every task (top-level list changes can hide edits within a column), and a migration to rewrite open tasks.

Rollout:

  • No migration. An open task stored before this change keeps its preview until the next task write on it, which recomputes it through the fallback above. A task that is never written again keeps its stored preview until it is decided, as with the status record.
  • No SQL or search changes. Tasks are not indexed. Each approval task write now does one indexed row lookup per version in the cycle.
  • The 2.0.x line needs its own PR: that code has neither the optimistic locking status write nor the status strip.
  • feat(governance): request a lifecycle exit such as Deprecated from the asset's status #37901 also edits CreateTask near the prior task lookup, so whichever lands second will need a rebase.
  • Public methods removed or renamed in ChangePreviewUtils: the 2 and 4 argument buildProposedChangesPayload overloads, and preserveProposedChanges (now preservePreviewState). A code search across the open source repository found no other callers; I could not search the Collate repository, so someone with access should check it before merge.

Tests:

Use cases covered

  1. A glossary term goes through three approval cycles; each task shows only its own edit (the issue's first repro).
  2. An approved metric edited by someone who isn't a reviewer shows the description change and no status change (the issue's second repro).
  3. Three edits while a task is open, by two users, each supersede the task; the last one shows the whole cycle.
  4. The open task's stored preview is replaced with a status only map; the next task still lists the whole cycle.
  5. The ingestion bot edits the description while the term is In Review; the next task shows the bot's description.
  6. A reviewer edits an approved term (approved on the spot), then someone else edits it; the task starts from the reviewer's version.
  7. The ingestion bot edits an approved term before someone else opens a cycle. The first task previews both edits, and rejection restores the approved term.
  8. A missing version triggers a snapshot comparison that retains visible edits and warns about incomplete history.
  9. A missing version and a missing base leave the changes after the gap with the same warning.

Unit tests

  • I added unit tests for the new/changed logic.
  • New: ApprovalCycleHistoryTest, ApprovalCycleTest, TriggeringChangeTest.
  • Updated: ChangePreviewUtilsTest (fold semantics replace the hop tests), CreateTaskLifecycleMoveTest, CreateTaskTest (oldest first priors).
  • RollbackEntityImplTest is unchanged and passes, which covers the predicate move.
  • Local run: 196 tests in 9 classes, 0 failures (ChangePreviewUtilsTest 56, CreateTaskTest 96, ApprovalCycleHistoryTest 10, RdfOntologyContractTest 10, RollbackEntityImplTest 7, ApprovalCycleTest 6, TriggeringChangeTest 5, CreateTaskLifecycleMoveTest 3, CreateTaskPostCommitPersistTest 3).
  • ApprovedBaseline has no test of its own; it is the predicate moved verbatim and is covered by RollbackEntityImplTest and the baseline cases in ApprovalCycleHistoryTest.

Backend integration tests

  • I added integration tests for the changed behavior.
  • ApprovalTaskPreviewIT covers the nine use cases above.

Local results at 5f77e8a, MySQL and Elasticsearch, each lane run the way CI runs it:

  • Parallel lane: 23 run, 0 failures. ApprovalTaskPreviewIT 6 of 6 (including the two that fail on main), GlossaryTermInheritedReviewerApprovalIT 7, GlossaryTermMoveApprovalIT 5, and the five approval methods of MetricResourceIT.
  • Global state lane: 14 run, 0 failures. ChangeRequestApplyIT 11, and three WorkflowDefinitionResourceIT methods: the two existing preview tests (test_approvalPreviewShowsTheChainOfEditsNotTheWorkflowsStatusWrite, test_approvalPreviewShowsTheNetOfEditsTakenBackWithinTheCycle) and test_tagAnotherChangePublishedLeavesTheRequestAndTheRestStaysUnderReview, which covers the change request preview refresh.

Not run locally: the rest of WorkflowDefinitionResourceIT and MetricResourceIT, and the nightly suites the planner lists as impacted but not local.

Review follow-up at 7cfe7c130ac

  • All 205 focused Java unit tests passed. They cover history-read exceptions, missing history, the 200-version cap, same-name column edits, and the default task-created notification.
  • All nine ApprovalTaskPreviewIT cases passed against MySQL and Elasticsearch. The new workflow regression checks that the opening preview includes the bot's edit and that rejection restores the approved term. The local retry gave Elasticsearch a longer startup window and limited its JVM to four processors.
  • All three targeted task-page Jest tests and both Java modules' Spotless checks passed.

Ingestion integration tests

  • Not applicable (no ingestion changes).

Playwright (UI) tests

  • Verified the warning with the three focused TaskTabNew Jest tests, including a task with only the incomplete flag.

Manual testing performed

None beyond the integration tests, which drive the real workflows against MySQL and Elasticsearch.

UI screen recording:

The warning appears in the existing Proposed Changes card.

Checklist:

  • I have read the CONTRIBUTING document.
  • My PR title is Fixes #35456: <short explanation>
  • My PR is linked to the issue via Fixes #35456 above.
  • I have commented on my code, particularly in hard to understand areas.
  • For JSON Schema changes: I updated the migration scripts or explained why it is not needed. The new key is optional and open tasks heal at their next write, so no migration.
  • I have added tests (unit / integration / Playwright as applicable) and listed them above.
  • Self review: I reviewed the final diff against REVIEW.md and fixed every finding.
  • Decision check: adds "An approval preview lists the change since its cycle began" under docs/decisions/ and marks the record it supersedes.
  • I have added a test that covers the exact scenario we are fixing.

@Vamsi-klu
Vamsi-klu requested a review from a team as a code owner November 26, 2026 13:04
@Vamsi-klu
Vamsi-klu requested a review from yan-3005 November 26, 2026 13:04
@github-actions

Copy link
Copy Markdown
Contributor

❌ PR checklist incomplete

This PR cannot be merged until the following are addressed on its linked issue:

The fields live on the linked issue in the Shipping project (open the issue → right sidebar → Projects). After you set them, re-run this check (or push a commit) — issue/project changes do not re-trigger it automatically.

Maintainers can bypass this check by adding the skip-pr-checks label.

@Vamsi-klu

Copy link
Copy Markdown
Contributor Author

Local test results for this branch. PR CI runs only the Java unit tests, so here is what I ran on my machine against MySQL and Elasticsearch.

RED, the new IT on main (1971feb plus only the test commit)

ApprovalTaskPreviewIT: 6 run, 4 passed, 2 failed.

  • Passed, as expected, because main already handles the issue's exact repros: aSecondApprovalCycleOnAGlossaryTermPreviewsOnlyItsOwnEdit, anApprovedMetricEditedByANonReviewerPreviewsTheEditedDescription, anEditWhileTheTaskIsOpenSupersedesItWithTheWholeCycle, aReviewerEditBetweenCyclesBecomesTheNextBase.
  • aBotEditDuringTheCycleIsInTheNextPreview failed: the next task still showed description: added [Edited definition] after the ingestion bot had changed it to Ingested definition.
  • aStalePreviewOnTheOpenTaskIsNotCarriedIntoTheNextTask failed: the next task showed only synonyms: added [Alias]; the description change from earlier in the cycle was gone.

Unit tests with the fix

196 tests in 9 classes, 0 failures: ChangePreviewUtilsTest (56), CreateTaskTest (96), ApprovalCycleHistoryTest (10), RdfOntologyContractTest (10), RollbackEntityImplTest (7, unchanged), ApprovalCycleTest (6), TriggeringChangeTest (5), CreateTaskLifecycleMoveTest (3), CreateTaskPostCommitPersistTest (3).

GREEN, integration tests with the fix

  • Parallel lane, 23 run, 0 failures: ApprovalTaskPreviewIT 6 of 6 (the two that failed on main now pass), GlossaryTermInheritedReviewerApprovalIT 7, GlossaryTermMoveApprovalIT 5, and the five approval methods of MetricResourceIT (post_metricWithoutReviewers_isApproved, post_metricWithReviewersButIncompleteMetadataRemainsDraft, post_metricWithReviewersCreatesApprovalTaskAndReviewerCanApprove, rejectNewMetricWithoutCommentSetsRejected, rejectMetricUpdateRollsBackPreviousApprovedVersion).
  • Global state lane, 14 run, 0 failures: ChangeRequestApplyIT 11, plus WorkflowDefinitionResourceIT#test_approvalPreviewShowsTheChainOfEditsNotTheWorkflowsStatusWrite, #test_approvalPreviewShowsTheNetOfEditsTakenBackWithinTheCycle and #test_tagAnotherChangePublishedLeavesTheRequestAndTheRestStaysUnderReview (the last one covers the change request preview refresh, which this PR narrowed).

Not run locally: the rest of WorkflowDefinitionResourceIT and MetricResourceIT (only the approval preview and approval methods ran), and the nightly suites the planner lists as impacted but not local (IncidentGroupTrendScaleIT, ReindexBenchmarkIT, EntityLoaderSmokeUIIT). Line coverage on the changed classes was not measured.

@pmbrull pmbrull left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

❌ Changes needed · 2 🔴 · 0 🟡

Blockers ❌ 2 🔴
Nits ✅ none
Tests ❌ gaps in history-read failure and incomplete-cycle coverage
Cross-repo ✅ checked the task payload consumer and available Collate callers
Trade-off ❌ reading history is bounded, and the preview needs to surface partial results
Auto-approved ➖ changes needed and a maintainer decision on the superseding ADR

Thanks for covering edits that happen between approval tasks and for providing main and branch test results.

  • 🔴 CreateTask.java:1342 — A failed history read can abort task creation. Move the read inside the guarded preview path and test that the task still opens after a history read fails. Existing inline finding
  • 🔴 ApprovalCycleHistory.java:78 — A missing version or the 200-version cap can leave the preview showing only the most recent part of the cycle. Compute the complete diff or show reviewers explicitly that the preview is incomplete. Add coverage for both a missing version and the cap.

The PR adds an ADR that supersedes the accepted approval-preview rule. Confirm the new rule with the original decider. The linked issue also needs a maintainer to add it to Shipping and rerun the metadata check. Metadata check details

What I checked

Traced workflow task creation, the history walk, and the Proposed Changes consumer. The original two issue scenarios already pass on main. The new integration tests cover residual cases involving older or skipped edits. The author reports 196 unit tests and 37 MySQL and Elasticsearch integration tests passed. Backend CI passed. Metadata and Collate Compatibility are red. The Compatibility status did not provide a job log.

claude-verdict {"sha":"5f77e8a900098650061f1f9dcc44661a42d1d579","recommendation":"request_changes","blocking":2,"nits_to_fix":0,"human_decision":true,"tradeoff":"does_not_hold","cross_repo":"checked","tests_ok":false}

@Vamsi-klu
Vamsi-klu requested a review from a team as a code owner November 26, 2026 21:41
@Vamsi-klu

Copy link
Copy Markdown
Contributor Author

@pmbrull thanks for the review. Both blockers are fixed in 9c09aa4 through 2894227, and I replied in each thread with the details.

@yan-3005 this PR adds ADR:2026-11-26-an-approval-preview-lists-the-change-since-its-cycle-began, which supersedes your 2026-11-03 record about the preview opening with the edit that started the cycle. Instead of carrying the preview forward and folding in each hop, every task write now rebuilds it from the version history since the cycle's base. Could you take a look and let me know if you're OK with that rule? The record shows your agreement as pending until then.

What I ran locally on the new head: 190 unit tests across the 7 preview classes (including the new VersionDiffTest), ApprovalTaskPreviewIT 8/8 and GlossaryTermInheritedReviewerApprovalIT 7/7 on MySQL and Elasticsearch, and the TaskTabNew Jest file 52/52. I haven't run the Postgres/OpenSearch lane or the rest of the workflow ITs. yarn i18n hung on my machine, so I added the new locale key to all 21 files directly. The i18n check in CI will be the real confirmation for that part.

The linked issue still needs a maintainer to add it to Shipping and rerun the metadata check. Nothing to change in the code for that one.

VersionDiff delegates list comparisons to MutationPlanner, which filters inherited references. Exercise a historical snapshot with inherited owners, reviewers and domains alongside a real edit.

@pmbrull pmbrull left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

❌ Changes needed · 2 🔴 · 0 🟡

Blockers ❌ 2 🔴
Nits ✅ none
Tests ❌ gaps in the history-exception fallback and nested field diffs
Cross-repo ✅ checked the task payload, approval UI and notification consumer
Trade-off ❌ the snapshot fallback can hide edits while reporting a complete preview
Auto-approved ➖ changes needed and maintainer agreement on the superseding ADR

Thanks for fixing task creation when history is unavailable and adding the incomplete-preview warning. Two paths can still present an incomplete preview as complete.

  • 🔴 ChangePreviewUtils.java:334 — When the history lookup throws, the task opens with the existing payload. A superseded task can supply a stale preview, and a first task can have no preview at all. Set the incomplete flag in this path and show the warning in the task-created notification as well as the task page. Cover a failed fresh read with a carried preview.
  • 🔴 VersionDiff.java:50 — With a missing history hop, a table column’s description or tag can change without changing its name. The snapshot diff emits a whole-list change that the preview reduces to the same column names. Show the nested edit or mark this result incomplete. Add a regression with a missing hop and an edit to a field on an existing column.

The superseding ADR still needs agreement from the original decider. The linked issue needs to go into Shipping, and the Compatibility check is red. Metadata check

What I checked

Read the guarded history lookup, snapshot comparison, task payload, task page and notification template. The new tests cover a missing history row, but the failure test accepts the original payload without a warning and the snapshot tests do not exercise changed values inside a column. Backend, UI checks and generated types pass. The author reports 190 unit tests, 15 MySQL and Elasticsearch integration tests, and 52 task UI tests passed. PostgreSQL and OpenSearch are outstanding.

claude-verdict {"sha":"b489552bc0c4dbaf93952176f6d1bc368a37377b","recommendation":"request_changes","blocking":2,"nits_to_fix":0,"human_decision":true,"tradeoff":"does_not_hold","cross_repo":"checked","tests_ok":false}

@pmbrull pmbrull assigned yan-3005 and unassigned pmbrull Nov 27, 2026
@yan-3005

Copy link
Copy Markdown
Contributor

@Vamsi-klu reviewed at b489552 and ran the tests locally (MySQL + ES).

Tests

  • ApprovalTaskPreviewIT on this head: 8/8 pass.
  • Same IT on main + only your test commit: 4 pass, 2 fail (aBotEditDuringTheCycleIsInTheNextPreview, aStalePreviewOnTheOpenTaskIsNotCarriedIntoTheNextTask). Matches what you reported.
  • Unit tests (8 preview/task classes): 198/198 pass.

Still open before merge

  1. History read fails → task keeps the carried preview with no incomplete flag (pmbrull's thread). Also the task-created notification never reads proposedChangesIncomplete. Details in that thread.
  2. Missing version row → a column's description/tag edit is invisible in the comparison fallback, and the preview still counts as complete (pmbrull's thread). Simplest fix: mark every comparison-fallback result incomplete.
  3. A bot edit made before the cycle opens is not previewed but reject still reverts it. Repro and suggested fix inline on CreateTask.java.

Not run: Postgres + OpenSearch lane, full WorkflowDefinitionResourceIT / MetricResourceIT.

@yan-3005

Copy link
Copy Markdown
Contributor

@Vamsi-klu I ran scenario tests on main and on 7cfe7c1 (MySQL + ES): the seeded glossary workflow, glossary and table workflows with other shapes, and the consolidation cases. Edits merged into one version and edits taken back inside a cycle both preview correctly. Three things still need fixing in this PR.

1. Starting from the last Approved version breaks other workflow shapes

ApprovalCycle.baseVersion now goes back to the last ApprovedBaseline. That only works when a workflow writes Approved on approval and rolls back on reject, which is the seeded glossary workflow. A workflow definition can follow a different flow: reject can set Rejected instead of rolling back, and a workflow may never write Approved at all.

Repro: a glossary workflow whose reject edge sets status Rejected, with no rollback.

v0.4 Approved (reviewer)            ← walk stops here
v0.5 admin edit1 → task1 → rejected (status Rejected, content kept)
v0.8 admin adds synonym → task2
PR:   task2 preview = {description: Approved→Edit1, synonyms: +Alias}   base=0.4
main: task2 preview = {synonyms: +Alias}

Task 2 lists edit 1 again, even though it was already rejected.

Bot edits also come out differently depending on the workflow, because the result depends on where an Approved status happens to sit:

Workflow Bot edit in preview
Seeded glossary shown
Glossary workflow with no status writes hidden
Table workflow (no reviewers, so every Approved version counts) hidden

2. Bot edits stay out of the preview

Bot edits skip governance on purpose (isBotChange). The reviewer decides only on edits that started a run.

3. Rollback (pre-existing on main; fix it here so the preview and reject agree)

a. Reject does nothing on entities without reviewers (tables).

  • When reviewers is empty, ApprovedBaseline counts any version with status Approved, so the rejected edit's own version (status Approved carried over) becomes the rollback target.
  • Run: table Approved at v0.4, admin adds a tag (v0.6, status still Approved), reject → the tag stays and status is Approved.

b. Rejecting an edit on a term that was already Rejected keeps the edit.

  • Rollback looks only for Approved versions. It finds none, sets Rejected and keeps the content.
  • Run: new term rejected (v0.3, "Original definition"), admin edits it to "Edited definition", reject → status Rejected, "Edited definition" kept.

c. Rollback wipes bot edits.

  • It restores the whole entity to the last approved version, so bot edits that skipped review get reverted too.
  • Run: term Approved, ingestion bot edits the description, admin adds a synonym, reject → the description goes back to the pre-bot value.

Changes needed

Preview:

  • The starting point is the triggering edit's previous version, or the starting point stored on an open task it supersedes. No ApprovedBaseline and no status reads anywhere in the preview: not for opening a cycle, not as the fallback.
  • Tasks stored before this change, which have no stored starting point, fall back to the version before the latest change.
  • Leave out of the fold any version written by a bot that does not trigger this workflow.
  • Keep the rest: rebuilding from history at every task write, picking the oldest of several open prior tasks, the incomplete flag, and the notification warning.

Rollback:

  • A version counts as approved only when it records the approval itself: a status change to Approved, or the reviewer's own edit. An Approved status carried over from an earlier version never counts, whether or not the entity has reviewers.
  • Roll back to the last decision, approved or rejected, whichever is newer.
  • Revert only the fields the preview lists (governed changes since the starting point) to their starting values. Leave fields that only bots changed. If a bot and a user changed the same field, say how you handle it and test it.
  • With these, the card shows exactly what reject undoes, whatever the workflow's shape.

Tests (ITs, MySQL and Postgres):

  • Flip aBotEditDuringTheCycleIsInTheNextPreview and aBotEditBeforeTheCycleIsPreviewedAndRevertedOnRejection: the bot edit is not shown, and reject keeps it.
  • A workflow whose reject sets Rejected: task 2 does not list edit 1.
  • A table workflow with rollback: reject reverts the edit.
  • A term rejected, edited, then rejected again: rolls back to the rejected version.
  • A bot edit plus a user edit, then reject: the bot edit stays.
  • A bot and a user changing the same field.

Vamsi-klu commented Nov 27, 2026 •

Copy link
Copy Markdown
Contributor Author

Thanks for running through these workflows, Yan. The preview now starts from the triggering edit’s previous version or the oldest open task it replaces. Rejection uses that same history to restore the previous decision and undo the reviewed changes.

Bot-only edits stay in place. If both write the same field, rejection restores an earlier bot value and preserves a later bot write. If a history row is missing, the preview warns about the gap and shows the changes it can still undo.

All 209 focused unit tests passed. All 14 integration cases passed on both MySQL and PostgreSQL, including the custom Rejected workflow and the table without reviewers.

Comment on lines +1337 to +1351
ApprovalCycle.recordReviewedRange(variables, new ReviewedRange(entity.getId(), 0, 0, null));
CyclePreview preview;
try (FreshReadScope.Handle ignored = FreshReadScope.enter()) {
ApprovalCycleHistory history = ApprovalCycleHistory.forEntityType(entityType);
EntityInterface<?> current =
ApprovalCycleHistory.currentVersion(
Entity.getEntityRepository(entityType), entity.getId());
Object triggeringVersion =
variables.getNamespacedVariable(GLOBAL_NAMESPACE, TRIGGERING_VERSION_VARIABLE);
double base =
ApprovalCycle.baseVersion(
TriggeringChange.baseVersion(current, triggeringVersion),
carriedApprovalBases(ownRange, priors, entity.getId()),
() -> ApprovalCycleHistory.previousVersion(current));
CycleChanges changes = history.changesSince(current, base);

Copy link
Copy Markdown

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

⚠️ Bug: Failed history read leaves a 0..0 range, so reject reverts nothing

cyclePreview stores a placeholder ReviewedRange(entityId, 0, 0, null) before it reads the history. If currentVersion, previousVersion or changesSince then throws, ChangePreviewUtils.previewOrFallback catches the error (JsonParsingException/EntityNotFoundException/IllegalArgumentException/JdbiException) and the task still opens, but the placeholder stays as the node and global range.

When the reviewer rejects, RollbackEntityImpl.reviewedRange → ApprovalCycle.reviewedRange returns that placeholder. Nothing there filters tip() > 0, so neither legacyReviewedRange nor the old applyRejection rollback runs. rejectReviewedChanges then undoes only versions with version <= 0, which is none, and sets the status to Rejected through priorDecision(…, 0). The rejected term keeps every unreviewed edit. carriedApprovalBases already treats tip == 0 as "no range", but the rollback path doesn't.

Fix: have rangeFor/reviewedRange ignore placeholder ranges (tip() > 0) so rejection falls back to the legacy or approved-version rollback. Or clear the variable instead of writing a 0..0 range.

Treat the placeholder as absent when resolving the range for rollback:

public static Optional<ReviewedRange> rangeFor(Object variable, UUID entityId) {
  return variable instanceof String json
      ? Optional.ofNullable(JsonUtils.readValue(json, ReviewedRange.class))
          .filter(range -> entityId.equals(range.entityId()))
          .filter(range -> range.tip() > 0)
      : Optional.empty();
}
  • Apply fix

Check the box to apply the fix or reply for a change | Was this helpful? React with 👍 / 👎

@gitar-bot

gitar-bot Bot commented Nov 27, 2026

Copy link
Copy Markdown
Code Review ⚠️ Changes requested 🔴 High risk 2 closed / 3 findings

Approval rejection now reconstructs and patches entity history, so range or diff errors could restore unintended metadata or leave rejected changes in place.

Reworks the approval task Proposed Changes preview to fold every change since the approval cycle began, recomputed from version history on each task write, and adds an incomplete-history warning. Changes are requested before merge because a failed history read leaves a 0..0 placeholder range in the cycle, so rejecting the task reverts nothing. ApprovalCycle.reviewedRange and RollbackEntityImpl need to ignore placeholder ranges (tip() > 0) so rejection falls back to the legacy or approved-version rollback. Failed history reads now abort approval task creation and inherited owners/reviewers are no longer reported as removed in the comparison fallback.

⚠️ Bug: Failed history read leaves a 0..0 range, so reject reverts nothing

📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/elements/nodes/userTask/CreateTask.java:1337-1351 📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/elements/nodes/automatedTask/impl/RollbackEntityImpl.java:106-113 📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/elements/nodes/automatedTask/impl/RollbackEntityImpl.java:143-157 📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/util/ApprovalCycle.java:61-75

cyclePreview stores a placeholder ReviewedRange(entityId, 0, 0, null) before it reads the history. If currentVersion, previousVersion or changesSince then throws, ChangePreviewUtils.previewOrFallback catches the error (JsonParsingException/EntityNotFoundException/IllegalArgumentException/JdbiException) and the task still opens, but the placeholder stays as the node and global range.

When the reviewer rejects, RollbackEntityImpl.reviewedRange → ApprovalCycle.reviewedRange returns that placeholder. Nothing there filters tip() > 0, so neither legacyReviewedRange nor the old applyRejection rollback runs. rejectReviewedChanges then undoes only versions with version <= 0, which is none, and sets the status to Rejected through priorDecision(…, 0). The rejected term keeps every unreviewed edit. carriedApprovalBases already treats tip == 0 as "no range", but the rollback path doesn't.

Fix: have rangeFor/reviewedRange ignore placeholder ranges (tip() > 0) so rejection falls back to the legacy or approved-version rollback. Or clear the variable instead of writing a 0..0 range.

Treat the placeholder as absent when resolving the range for rollback
public static Optional<ReviewedRange> rangeFor(Object variable, UUID entityId) {
  return variable instanceof String json
      ? Optional.ofNullable(JsonUtils.readValue(json, ReviewedRange.class))
          .filter(range -> entityId.equals(range.entityId()))
          .filter(range -> range.tip() > 0)
      : Optional.empty();
}
✅ 2 closed
✅ Bug: Failed history read now aborts approval task creation

📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/elements/nodes/userTask/CreateTask.java:1328-1342 📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/util/ChangePreviewUtils.java:301-314 📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/util/ApprovedBaseline.java:37-40
The old buildProposedChangesPayload caught every exception and kept the existing payload. ChangePreviewUtils.previewOrUnchanged still has the comment "A preview the task cannot show must not keep the approval task from being created", but that guarantee no longer holds.

The cycle preview is now computed in CreateTask.cyclePreview (lines 1342-1361). That method runs repository.find, TriggeringChange.baseVersion, the approvedBaseline walk (which calls EntityStatusAdapter.forEntityType, SubjectContext.getSubjectContext) and history.changesSince. None of this runs inside previewOrUnchanged, and the previewOrUnchanged catch now only handles JsonParsingException.

So any other runtime failure while reading history reaches the catch (Exception exc) in notify and becomes a BpmnError, and the workflow fails without opening an approval task. Examples: an IllegalArgumentException from EntityStatusAdapter.forEntityType for an entity class that doesn't declare getEntityStatus (the erased return type is Enum, which isEnum() rejects), an EntityNotFoundException from find if the entity is deleted mid-run, or a transient DB error. The preview used to be best-effort and is now a hard dependency of task creation.

Fix: compute the CyclePreview inside the guarded path, e.g. make withCyclePreview take a Supplier<CyclePreview> that previewOrUnchanged invokes. Then catch the specific exceptions the history read can throw (EntityNotFoundException, IllegalArgumentException, JDBI/DB exceptions), log them and keep the existing payload.

✅ Bug: Comparison fallback reports inherited owners/reviewers as removed

📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/util/VersionDiff.java:54-67 📄 openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/util/ApprovalCycleHistory.java:154-162
The fallback in netChange diffs two rows that are built differently. The base row comes from entity_extension. That row is the updater's original, which EntityRepository loads with setFieldsInternal and then setInheritedFields, so it holds the owners, reviewers and domains the term inherits from its glossary or parent, each marked inherited: true. The current version normally has no extension row. For it, EntityRepository.getVersion returns setFieldsInternal(find(id, ALL), putFields) and never calls setInheritedFields.

VersionDiff.reviewedFields only strips bookkeeping fields and derived tags. So when a term's reviewers come from its glossary, a cycle that falls back to the comparison (a missing row, or more than 200 versions) shows those inherited reviewers and owners as removed. The reviewer sees removals that nobody made.

The new IT doesn't catch this because approvedTerm puts reviewers on the term itself and gives the glossary no owners, reviewers or domains.

Fix: drop inherited references from both sides in reviewedFields, or load both versions through the same path so inheritance is applied the same way. Add a VersionDiffTest case where the base has an inherited reviewer and the current version has none.

🤖 Prompt for agents
Code Review: Reworks the approval task Proposed Changes preview to fold every change since the approval cycle began, recomputed from version history on each task write, and adds an incomplete-history warning. Changes are requested before merge because a failed history read leaves a 0..0 placeholder range in the cycle, so rejecting the task reverts nothing. `ApprovalCycle.reviewedRange` and `RollbackEntityImpl` need to ignore placeholder ranges (`tip() > 0`) so rejection falls back to the legacy or approved-version rollback. Failed history reads now abort approval task creation and inherited owners/reviewers are no longer reported as removed in the comparison fallback.

1. ⚠️ Bug: Failed history read leaves a 0..0 range, so reject reverts nothing
   Files: openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/elements/nodes/userTask/CreateTask.java:1337-1351, openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/elements/nodes/automatedTask/impl/RollbackEntityImpl.java:106-113, openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/elements/nodes/automatedTask/impl/RollbackEntityImpl.java:143-157, openmetadata-service/src/main/java/org/openmetadata/service/governance/workflows/util/ApprovalCycle.java:61-75

   `cyclePreview` stores a placeholder `ReviewedRange(entityId, 0, 0, null)` before it reads the history. If `currentVersion`, `previousVersion` or `changesSince` then throws, `ChangePreviewUtils.previewOrFallback` catches the error (JsonParsingException/EntityNotFoundException/IllegalArgumentException/JdbiException) and the task still opens, but the placeholder stays as the node and global range.
   
   When the reviewer rejects, `RollbackEntityImpl.reviewedRange` → `ApprovalCycle.reviewedRange` returns that placeholder. Nothing there filters `tip() > 0`, so neither `legacyReviewedRange` nor the old `applyRejection` rollback runs. `rejectReviewedChanges` then undoes only versions with `version <= 0`, which is none, and sets the status to Rejected through `priorDecision(…, 0)`. The rejected term keeps every unreviewed edit. `carriedApprovalBases` already treats `tip == 0` as "no range", but the rollback path doesn't.
   
   Fix: have `rangeFor`/`reviewedRange` ignore placeholder ranges (`tip() > 0`) so rejection falls back to the legacy or approved-version rollback. Or clear the variable instead of writing a 0..0 range.

   Fix (Treat the placeholder as absent when resolving the range for rollback):
   public static Optional<ReviewedRange> rangeFor(Object variable, UUID entityId) {
     return variable instanceof String json
         ? Optional.ofNullable(JsonUtils.readValue(json, ReviewedRange.class))
             .filter(range -> entityId.equals(range.entityId()))
             .filter(range -> range.tip() > 0)
         : Optional.empty();
   }

Verification

Rules No rules evaluated

Functional validation Not enabled

Set up

Auto-approval Not enabled

Set up

For more verification details, comment gitar display:verbose.

Options

Display: compact → Showing compact verification results.

Comment with these commands to change the behavior for this request:

Compact
gitar display:verbose         

Was this helpful? React with 👍 / 👎 | Powered by Gitar — free for open source

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Approval task "Proposed Changes" shows a stale diff for glossary terms and omits the edited fields for metrics

3 participants