Repository navigation
Integrate DDR group skew preservation and bounded compaction - #5908
ShiboSoftwareDev wants to merge 4 commits into
Conversation
|
The latest updates on your projects. Learn more about Vercel for GitHub.
|
Same Machine Benchmark ResultsBoth revisions ran sequentially on one machine. Dataset:
Outcome changes: 0 improved, 0 regressed. Length matchingSkew counts are individual required checks, not whole boards. Incomplete = missing routes; uncertain = unresolved timing. Lower skew is better.
Mean and worst use 6 matched complete groups. Missing results are n/a. Matching against the original boardPreserved means no worse than the original board. Timing limits are checked separately. ST P/N pairs are informational.
Length and skew checksValues use the unit in Target. Orig = original-board matching target. Info = comparison only. Timing estimates can be uncertain.
Lane auditFull signal mappings, sources and routing targets are in results.json.
Base pipeline stage timingsCore DDR Recorded phases from 1/1 circuits (0 partial).
PR pipeline stage timingsCore DDR Recorded phases from 1/1 circuits (0 partial).
Per-circuit results (1)
Dependency versions
Runtime, provenance and scopeBun 1.4.3 · linux arm64 · unknown · 120s render budget per circuit. Fresh process per circuit. Validation is timed separately. Connectivity uses final saved copper. Fixtures keep original placements and routing rules. Detailed sources, audit decisions and model assumptions are retained in results.json. Workflow status: success. Logs and artifacts. |
Same Machine Benchmark ResultsBoth revisions ran sequentially on one machine. Dataset:
Outcome changes: 0 improved, 0 regressed. Length matchingSkew counts are individual required checks, not whole boards. Incomplete = missing routes; uncertain = unresolved timing. Lower skew is better.
Mean and worst use 24 matched complete groups. Missing results are n/a. Matching against the original boardPreserved means no worse than the original board. Timing limits are checked separately. ST P/N pairs are informational.
Length and skew checksValues use the unit in Target. Orig = original-board matching target. Info = comparison only. Timing estimates can be uncertain.
Lane auditFull signal mappings, sources and routing targets are in results.json.
Base pipeline stage timingsCore DDR Recorded phases from 10/10 circuits (6 partial).
PR pipeline stage timingsCore DDR Recorded phases from 10/10 circuits (6 partial).
Per-circuit results (10)
Dependency versions
Runtime, provenance and scopeBun 1.4.3 · linux arm64 · unknown · 120s render budget per circuit. Fresh process per circuit. Validation is timed separately. Connectivity uses final saved copper. Fixtures keep original placements and routing rules. Detailed sources, audit decisions and model assumptions are retained in results.json. Workflow status: success. Logs and artifacts. |
Preserve the original whole-byte DDR requirements that the benchmark measured but omitted from Core’s routing requests. Integrate our small Bus fix so compaction keeps its numerical roundoff inside those requirements.
Only the benchmark and Bus pins change, plus the affected H616 snapshot. Board geometry, numeric goals, phases and the 120-second budget remain unchanged. No new solver or third-party open PR dependency.
Glider retains 22 connected signals, zero physical findings and 30 vias; wire increases 674.874 → 677.536 mm. Both data bytes preserve their original skew. Address/command routing still fails; no full-board timing pass is delivered.
The skew table uses separately labelled 120-second matching-only diagnostics. In normal full-board runs, all ten retained Core outputs have identical copper hashes, connected counts (304/610) and zero physical findings against the control. Matching diagnostics have no connection losses or additional physical findings. All-ten comparison · Final preview verification. The final preview’s executed bundle is byte-identical to the all-ten tested bundle. No speedup or memory reduction is claimed.
Core’s ten Bun shards, types and builds pass. The focused H616 snapshot update passes with no circuit errors; the Bus fixture retains 53/53 connected, 9/9 skew rules, 6/6 preservation checks and clean DRC. Bus’s six Bun shards, types, format and build pass. Its fresh paired AM3352 comparison accepts 11/11 samples on both revisions with connectivity, DRC, matching, coupling and fixed-fanout preservation passing; all eleven completed routed images are inspected.
Upstream: benchmark repro #18 → fix #19; Bus repro #259 → fix #260.
The official all-ten Core benchmark, at the unchanged 120-second budget, has no outcome or skew improvement: main and PR both retain 346/610 connected signals, four complete DRC-clean boards, and zero boards passing all required skew checks. Required checks are 4 passed, 31 failed, 62 incomplete and 2 uncertain on both. All ten retained copper records and measured skews are identical. This official workflow uses main’s input generator for both revisions; it does not exercise benchmark #19. Matching gets the time left after ordinary routing (Glider 12s, OrangeCrab 36s, H616 60s), and its partial outputs are not selected.
Merge gate: Core requires published dependency versions. Keep this draft until our Bus fix publishes, then replace its preview pin; the dependency-policy check is intentionally unchanged.