Skip to content

docs: Align security management with ML 2 readiness - #889

Closed
janis-qorix wants to merge 6 commits into
eclipse-score:mainfrom
qorix-group:ml2-security-management-fdr
Closed

janis-qorix wants to merge 6 commits into
eclipse-score:mainfrom
qorix-group:ml2-security-management-fdr

Conversation

@janis-qorix

@janis-qorix janis-qorix commented Nov 19, 2026 •

Copy link
Copy Markdown
Contributor

Description

This PR prepares the Security Management process area for maturity level 2 (ML 2, "Managed") as defined in the maturity legend of the process area overview.

Changes:

  • Security audit: The external security audit (wf__p_fs_audit_security) and its report (wp__audit_report_security) are marked as tailored out for the current increment and planned before the ML 3 assessment. The text now matches the platform security plan in eclipse-score/score, which already states this.
  • Formal security review: The formal review (wf__p_formal_security_rv) is marked as tailored out for the current increment. ML 2 verification is performed as internal inspection by a security manager, documented with the security FDR checklists.
  • Committer competence: The guideline refers to the committer election criteria in the platform security plan instead of stating that no security competence needs to be enforced.
  • Formal review checklists: The platform security plan and security package checklists now contain review items instead of placeholders that referred to Update Security Plan and Security Management Plan #452. The items follow the safety plan and package FDR templates. Item 2 of the package checklist is intentionally "NO", because the security package does not contain an argument that the platform is secure.
  • Template title: The title of the security plan FDR template is corrected from "Security Analysis Checklist" to "Security Plan Checklist".

Review and verification

  • The documents build locally with bazel run //:docs without warnings.
  • The security checklists now cover the clause 6.4 requirements of ISO/SAE 21434 that were missing: relevance and reuse decision (RQ-06-02), configuration management (RQ-06-11, RQ-06-12), the cybersecurity assessment decision and assessor independence (RQ-06-24 to RQ-06-28), and the assessment report recommendation (RQ-06-31, RQ-06-32).
  • The package argument item now depends on a reviewed tailoring rationale for the cybersecurity case (RQ-06-23, RQ-06-14). Committer competence is stated as required (RQ-05-07).
  • All checklist complies IDs exist in the standard. The mapping of each ID to a requirement is derived by counting the requirements per clause. A security manager needs to confirm the individual mapping, because the repository does not contain the clause texts.
  • The tailoring decisions are recommendations and still need approval. wf__p_fs_audit_security and wf__p_formal_security_rv name the project lead as approver.

Related

🤖 Generated with Claude Code

janis-qorix and others added 4 commits November 19, 2026 11:33
Replace the placeholder checklist with 12 review items modelled on the
safety plan FDR template, fix the document title, and reference the
formal security review workflow.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
The formal security review workflow makes the external security auditor
responsible; the security manager supports it.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Replace the placeholder checklist with 6 review items modelled on the
safety package FDR template. The security package intentionally does not
contain an argument that the platform is secure.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Mark the external security audit and the formal security review as tailored
out for the current increment, planned before the ML 3 assessment. ML 2
verification is performed as internal inspection with the security FDR
checklists. The committer competence sentence now refers to the project's
committer election criteria in the platform security plan.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
The tailoring text replaced the headers of the formal security review and
the security manual workflows. The Sphinx build reported the broken line
blocks and unresolved links as warnings.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
@github-actions

Copy link
Copy Markdown
Contributor

The created documentation from the pull request is available at: docu-html

Add checklist items for the clause 6.4 requirements that were not covered:
relevance and reuse decision (RQ-06-02), configuration management (RQ-06-11,
RQ-06-12), the cybersecurity assessment decision and assessor independence
(RQ-06-24 to RQ-06-28), and the assessment report recommendation (RQ-06-31,
RQ-06-32). Make the package argument item depend on a reviewed tailoring
rationale for the cybersecurity case (RQ-06-23, RQ-06-14). State that
committers with security roles need competence (RQ-05-07).

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
@janis-qorix

Copy link
Copy Markdown
Contributor Author

Closing this draft for now. The change moves to an internal review on the Qorix fork first, as agreed with the process community: qorix-group#2 . It will be reopened as a new pull request here after that review.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant