@janis-qorix

@janis-qorix janis-qorix commented Nov 19, 2026 •

Copy link
Copy Markdown

Summary

Brings the security management area of process_description to what ML 2 needs for S-CORE: complete workflows, work products and checklists, correct standard references, and a complete proposal for every tailoring point. Qorix fork only; draft, not for eclipse-score yet.

Every point below is a proposal for confirmation. Nothing is left open: the responsible role confirms the proposal or asks for a change.

Proposals for confirmation

# Proposal Confirms
1 Formal reviews are active. An "external" security manager from the pool (did not create or approve the work product) performs them, as in safety management. They check the tailoring rationales (RQ-06-14) and the independent review of the assessment rationale (RQ-06-25). The workflow covers plan, package and security analyses. Security manager pool
2 Cybersecurity assessment before the release for post-development. New workflow wf__p_security_assessment, guideline gd_guidl__security_assessment (6.4.8) and work product wp__security_assessment_report (WP-06-03). The security plan no longer claims WP-06-03. Project Lead Circle with security manager pool
3 Security audit before the ML 3 assessment. Rationale: for ML 2 the formal reviews and the assessment (scope: plan and all work products, RQ-06-30) judge conformity. The earlier comparison with the safety audits is removed (the initial safety audit was already performed, release notes 2.0.0). Process community
4 Clause 7: cybersecurity interface with the integrator. 7.4.3 modelled (distributed_7431 to 7435, WP-07-01). Guideline gd_guidl__security_interface with the content of RQ-07-04; the platform part is published in the security manual, which claims WP-07-01. Supplier capability and request for quotation (7.4.1, 7.4.2) are tailored out: S-CORE selects no suppliers. Process community, Project Lead Circle
5 Clauses 11, 12, 14 are distributed activities, not tailored activities (note of 6.4.3). The standards page lists them separately from the irrelevant clauses. Process community
6 Sources and triggers (WP-08-01, WP-08-02) are defined by the platform security plan (vulnerability management part, see score#6); the plan claims them again. Security manager pool
7 Incident response plan (WP-13-01): one per incident, recorded in the security problem issue, content a) to g) of RQ-13-01 in the guideline. New work product wp__security_incident_response_plan. Security manager pool
8 Release for post-development report as own work product (WP-06-04); the formal review report no longer claims it. Security manager pool
9 Relevance decision and reuse: relevance step in the plan workflow (RQ-06-02, Annex D); reuse analysis through the change impact analysis, extended by the validity of claims and assumptions (RQ-06-16 b). Security manager pool, process community (change management)
10 Off-the-shelf and open-source components: the security engineer assesses them against RQ-06-21 a) to c) and RQ-06-22, the security manager approves. Security manager pool
11 Tool names are removed from the process text; the plan keeps the tools. Process community
12 No separate tailoring work product: rationales in the platform security plan, checked in its formal review. Security manager pool
13 Work product mapping: security manual → WP-10-02 and WP-07-01; SBOM no longer claims WP-08-06; configuration information (RQ-05-12) and quality management (RQ-05-11) claimed by the guideline; committer security competence required (RQ-05-07). Security manager pool

Checks

  • Build without warnings (bazel run //:docs).
  • All modelled ISO/SAE 21434 work products are claimed once this PR and process_description#3 are merged.
  • Checklist references checked against the standard text (6.4.2 to 6.4.9, 5.4.4, 7.4.3, 8.3, 13.3).

Other PRs in this series

  • process_description#3 (based on this branch): clause 9 at platform level, risk determination, analysis checklist.
  • score#6: platform security plan with the decisions, the clause table, the cybersecurity interface, sources, triggers and incident response.

AI: Claude Code. First version with Claude Haiku 5.5 (claude-haiku-5-5), reviewed and revised with Claude Opus 5.5 (claude-opus-5-5).

🤖 Generated with Claude Code

janis-qorix and others added 21 commits November 20, 2026 11:45
Replace the placeholder checklist with 12 review items modelled on the
safety plan FDR template, fix the document title, and reference the
formal security review workflow.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
The formal security review workflow makes the external security auditor
responsible; the security manager supports it.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Replace the placeholder checklist with 6 review items modelled on the
safety package FDR template. The security package intentionally does not
contain an argument that the platform is secure.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Mark the external security audit and the formal security review as tailored
out for the current increment, planned before the ML 3 assessment. ML 2
verification is performed as internal inspection with the security FDR
checklists. The committer competence sentence now refers to the project's
committer election criteria in the platform security plan.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
The tailoring text replaced the headers of the formal security review and
the security manual workflows. The Sphinx build reported the broken line
blocks and unresolved links as warnings.

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
Add checklist items for the clause 6.4 requirements that were not covered:
relevance and reuse decision (RQ-06-02), configuration management (RQ-06-11,
RQ-06-12), the cybersecurity assessment decision and assessor independence
(RQ-06-24 to RQ-06-28), and the assessment report recommendation (RQ-06-31,
RQ-06-32). Make the package argument item depend on a reviewed tailoring
rationale for the cybersecurity case (RQ-06-23, RQ-06-14). State that
committers with security roles need competence (RQ-05-07).

Co-Authored-By: Claude Haiku 5.5 <noreply@anthropic.com>
The security roles and the security workflow asked the Security Manager to verify the
preconditions for a "release for production". That is the ISO 26262 term. ISO/SAE 21434
uses "release for post-development" (clause 6.4.9), and the release conditions of
RQ-06-33 and RQ-06-34 are the ones meant here. Changing the term does not change the
obligation; a later decision (E12) decides whether a work product carries it.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
The guideline for the security package said "platform safety package". That is a copy
from the safety guideline. The check it describes (completeness of the process compliance
against the standard linkage charts) applies to the security package, so the word is
changed. The rest of the paragraph is not changed here.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
The formal reviews of the platform security plan and package, and of the security
analyses, were tailored out for the current increment in the earlier change to this
branch. The reviews are the mechanism that checks the tailoring rationales (RQ-06-14) and
the independent review of the assessment rationale (RQ-06-25). A tailoring of the review
would leave both without a review. Safety performs its formal reviews, with a reviewer
who is not the author of the work product.

The change restores the review as an active workflow. The reviewer is required to be
independent of the reviewed work product, and the independence is recorded in the report.
The package and plan review templates no longer say that the review is tailored out.
The question who the reviewer is stays with the security manager pool (decision E7).

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…t the template links

The security plan work products described a "change impact analysis" with a sentence
copied from the safety area. No workflow produces it, and the reuse analysis of
ISO/SAE 21434 (RQ-06-15 to RQ-06-17) is what the plan must cover. The sentence now refers
to the change management impact analysis template, which already covers security impact
and affected work products. The template is still to be extended with the validity of
cybersecurity claims and assumptions (RQ-06-16 b). That extension is a separate change.

The plan checklist item 2 asks for a reuse analysis instead of an impact analysis.

The platform security plan work product linked the security manual template, and the
module security plan linked the module security manual template. Both are corrected to
the plan templates.

Decision E8 is pending with the security manager pool; this commit is a proposal.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…nce step (E14)

E12. The standard lists a release for post-development report as a work product of
clause 6.4.9 (WP-06-04), and the release conditions of RQ-06-33 and RQ-06-34 are its
content. The security area had no such work product and used the safety term "release
for production". The new work product carries WP-06-04. The formal review report and the
platform and module security manuals no longer claim WP-06-04: a manual describes the
requirements for post-development, which is WP-10-02 (development_1052). The formal
review report supports the rationale reviews (RQ-06-14, RQ-06-25) and has no work product
of its own in clause 6.4.

E14. The plan checklist asks whether an item is cybersecurity relevant and whether it is
reused, but no process step produced that decision. The plan now states the decision and
its method, the relevance annex of the standard (RQ-06-02 a to c).

Both are proposals. The decisions E12 and E13 are pending with the security manager pool;
the mapping in E13 needs their confirmation.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
Items 2 and 4 of the security package checklist were answered in advance. The answers
were written before the review had run: the package does not contain the argument, and
the audit report is tailored out. Item 4 asks about conditions that RQ-06-34 does not
contain, and item 2 is answered "no" by a text rather than by a reviewed rationale
(RQ-06-14). The rationale placeholders are back, so the reviewer answers the question.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
The upstream checklist for the security plan asks whether the content is free from tools.
The process area still named sphinx-needs, a gitlab tracker link, a docs-as-code approach
and a project management dashboard. The process describes what is done; the plan and the
tooling say how. The names are replaced by the activity: a need of the documentation
tooling, the security policy of the Eclipse Foundation, the documentation approach of the
process, and the status reporting of the project. The issue tracking work product is kept,
it is a work product, not a tool.

Decision E5 is pending with the process community; this commit is a proposal.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…21, RQ-06-22)

The plan checklist has no item for off-the-shelf components, although the plan claims the
clauses 6.4.4 to 6.4.6. The item asks for the three analyses of RQ-06-21 (requirements,
suitability, documentation), and RQ-06-22 for activities when the documentation is
insufficient. The decision on the assessment method (E9) is still pending; the item asks
the question and does not answer it.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…t assessment (E9)

The platform is built from open-source and third-party components. The standard requires
an analysis of their documentation, their suitability and their fulfilment of the allocated
cybersecurity requirements before integration (RQ-06-21), and activities when the
documentation is insufficient (RQ-06-22). The security area had only the SBOM, which lists
components but does not perform these analyses. The new work product names the three
results. The SBOM stays as it is.

This is a draft of the work product only. The workflow that produces it, and whether the
security manager or the component classification of the safety area does the assessment,
is open with decision E9.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…sessment (E9)

The work product for the component assessment (previous commit) needs a workflow that
produces it. It is proposed as a workflow of the security management area: the security
engineer performs the assessment against the three results of RQ-06-21, the security manager
approves it, and a committer supports it. The inputs are the SBOM and the issue tracking
work products that already exist. Where the documentation is insufficient, RQ-06-22 asks
for the activities that close the gap; the workflow states that they are identified and
planned.

The roles are the existing security engineer, security manager and committer. Whether the
assessment is done by the security manager or by the component classification of the safety
area is part of decision E9, and the workflow is marked as not decided.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
… (decision 1)

The standards page declared clause 7 irrelevant because the project is open source. The
security guidelines and the integrator relationship show distributed activities, and a
distributed activity is not a tailoring: it needs an interface (RQ-07-04, WP-07-01). The
open-source argument describes the organisation, not the activities, and does not meet
RQ-06-14.

The page now states the split: the alignment of distributed activities and interfaces,
the vulnerability handling across the parties, and the interface agreement apply to the
platform; supplier capability and requests for quotation are tailored out, because S-CORE
does not select suppliers. The rationale is a proposal to be reviewed. Decided by the
process community, with the Project Lead Circle for the interface.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…nales live

Clause 7 is partly relevant, for the cybersecurity interface with the integrator only. Its
supplier requirements are tailored out, because S-CORE does not select suppliers. The rationale is
reviewed under RQ-06-14 and documented in the platform security plan.

Clauses 11, 12 and 14 are performed by the integrator and reach the platform through the same
interface. The platform part (security manual, post-development requirements) stays in the
platform security plan. The statement "in responsibility of the system integrator" alone is
not a tailoring rationale.

The tailoring rationales are documented in the platform security plan (issue score#696 says
the same). The standards page points there instead of to the issue.

Clause 9 is decided in the separate clause 9 pull request.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…9), reuse question in the change impact template (E8)

E9: the workflow for the assessment of off-the-shelf and open-source components is decided
as written. The security engineer performs it and the security manager approves it. The
component classification of the safety area is not used, because the assessment belongs to
the security claims (RQ-06-21, RQ-06-22).

E8: the change impact analysis template gets the question whether the cybersecurity claims and
assumptions are still valid after a change (RQ-06-16 b). Without it, the reuse analysis the
security plan refers to would not be covered by the template.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…the audit wording

- The platform security plan no longer claims the clause 13 maintenance work product. The
  incident response plan it refers to is not produced by this process, so the claim was wrong
  (decision E13).
- The concept's open questions on stakeholders, security plans, work products and tooling are
  answered by reference to the roles, the plans and the platform management plan. Tool names
  stay out of the process text (E5).
- The security audit is tailored out for ML 2 with the gate for ML 3 as the reason, in the
  workflow, roles, getting started and work product table (decision of the process community,
  as for the safety audits).

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…ing requirements, in the security guideline

- Configuration information needed to maintain cybersecurity in the field (RQ-05-12) is claimed
  by the security guideline. The SBOM is the configuration information for that purpose; the
  standard names the bill of materials only as an example. This also closes the SBOM mapping
  that was open before: the requirement identifier exists upstream.
- Handling of weaknesses and incidents (RQ-13-01, RQ-13-02) is claimed by the same guideline.
  The monitor workflow triages and manages reports from the field and the community, which is
  how the platform handles incidents. The platform has no vehicles in the field.

Not claimed here, and handed to the owners of their areas: the quality and tool requirements of
clause 5 (RQ-05-11, RQ-05-14), the development requirements of clause 10 (security engineering),
and the field update requirement of clause 13 (RQ-13-03), which is tailored out in the platform
security plan.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
@janis-qorix
janis-qorix force-pushed the ml2-security-management-fdr branch from adf384f to f61b880 Compare November 20, 2026 10:49
The platform and module SBOM work products claimed the work product "evidence of managed
vulnerabilities" (WP-08-06). An SBOM is not that evidence. The SBOM is claimed by the security
guideline for the configuration information (RQ-05-12), which is the requirement it serves; that
claim stays.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…plan does not define

- The security guideline claimed two recommendations of clause 5 (RC-05-13, RC-05-16) as if they
  were requirements. A recommendation carries no claim; they are removed. The requirement the
  guideline serves (configuration information, RQ-05-12) stays claimed.
- The platform security plan claimed the sources (WP-08-01) and triggers (WP-08-02) of cybersecurity
  information. The plan does not define them; the monitor workflow is the place where that happens.
  The claims are removed here, and the monitor workflow claim is left for the owner of that
  workflow to decide.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
The checklist of the platform security plan refers to the clause 6.4.8 requirements
(prj_management_6481 to prj_management_6489). They were not modelled, so the references could not
be checked. The identifiers are added to the standards page, each with status valid. No text of
the standard is added.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
… the modelled requirements

The checklists referred to requirements as plain text (for example RQ-06-14). The references in the
table cells are now links to the modelled requirements, so the build checks them. Plain text in
running prose is unchanged, because a reference in running prose reads as a claim.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
@janis-qorix
janis-qorix force-pushed the ml2-security-management-fdr branch from 0550165 to 76ce16c Compare November 20, 2026 11:24
janis-qorix and others added 3 commits November 20, 2026 15:09
…n guideline and work products

RQ-05-07 applies to persons who are assigned cybersecurity roles and responsibilities. Committers
hold such responsibilities (the SBOM workflow makes the committer responsible), so the earlier
statement that no security competence is enforced for committers contradicts the requirement. The
committer criteria already exist in the platform security plan of the score repository (Skills
section: ISO/SAE 21434 training or the project training, checked by the security manager). The
guideline now claims the requirement and points to that plan.

The plain references RQ-05-07, RQ-13-01, RQ-13-02, RQ-06-14, RQ-06-21 and RQ-06-22 and the
template gd_temp__change_impact_analysis in the guideline, the work products and the standards page
are now need references. The build has 0 warnings.

Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
- Cybersecurity assessment before the release for post-development:
  workflow, guideline and assessment report (WP-06-03); the plan no
  longer claims the assessment report.
- Formal reviews by an "external" security manager from the pool, as in
  safety management; the workflow covers the security analyses.
- Security audit before the ML 3 assessment, with the formal reviews and
  the assessment as the ML 2 evidence (replaces the safety comparison).
- Cybersecurity interface with the integrator: clause 7.4.3 modelled,
  guideline, platform part in the security manual (WP-07-01).
- Sources and triggers (WP-08-01, WP-08-02) defined by the platform
  security plan; incident response plan per incident (WP-13-01).
- Clauses 11, 12, 14 described as distributed activities; remove the
  "Decided" note and the duplicate claim of RQ-08-01.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…that describes it

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@janis-qorix janis-qorix changed the title docs: Security Management ML2, internal review (not for eclipse-score yet) docs: Security Management ML2, proposal for confirmation (not for eclipse-score yet) Nov 20, 2026
@janis-qorix

Copy link
Copy Markdown
Author

Superseded by eclipse-score#891 (same content, one clean commit). Closing the fork PR.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant