…ion 2, option A) The standards page declared clause 9 irrelevant because the concept is the responsibility of the system integrator. The platform itself is analysed once at platform level by the security analysis process (workflow "Analyze Platform"): trust boundary, security requirements and assumptions. That is clause 9 work at platform level. The item-level part stays with the integrator and is covered by the cybersecurity interface (clause 7, decision 1). This commit makes the platform part visible: the eleven requirements and seven work products of clause 9 are modelled with identifiers, as for the other clauses, without claims. The claims follow in the next commit, and only where the process text supports them. Decision 2 is pending with the process community (scope) and the security analysis owner (content); this commit is a proposal. Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
The security analysis guideline claims the requirement that the analysis is based on the item definition and identifies threat scenarios. The platform analysis text (attack surfaces between platform features, shared attack vectors) is the threat analysis of that requirement at platform level. The claim is placed on the guideline, because a work product may claim only work products of the standard in this repository. Not claimed here, and open: RQ-09-01 and RQ-09-02 (item definition, operational environment), RQ-09-04 (risk treatment), RQ-09-05 to RQ-09-07 (goals, claims, verification), and RQ-09-08 to RQ-09-11 (controls, requirements, concept). The process has no work product for most of them; the security analysis owner decides whether to add one or to state the tailoring. Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
… to clause 9 (E10) The formal review of the security analysis needs a checklist. It now covers the activities of clause 9 and the related requirements of clause 6.4.2 (plan updates) and 6.4.5 (assumptions of out-of-context components). The references are links to the requirements modelled on the standards page, so the build checks them. Those requirements exist for the platform level only (decision 2). The checklist is the content of the review; the security manager checks the references against the standard text as part of the review. Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
janis-qorix
force-pushed
the
ml2-clause9-platform
branch
from
November 20, 2026 10:03
aec37be to
d4ce649
Compare
…rements The earlier commit kept plain-text references, and the link edit was made after it was staged. The references now link to the requirements modelled on the standards page, so the build checks them. The clause 6.4.2 and 6.4.5 references link to the existing requirements. Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
… claims for item definition and TARA The standard requires an impact rating, an attack feasibility rating and a risk value for each threat scenario (RQ-09-03, clause 15). The process had threat scenarios and mitigations but no rating, while the analysis area claimed the clause 15 requirements for the rating. The claim had no evidence behind it. The guideline now defines the rating: impact per asset property, attack feasibility from the attack factors, and the risk value as a mapping of the two. A risk value of 3 or 4 needs a treatment. The scale is the process's own, because the standard requires the rating, not a scale. The platform security analysis work product claims the item definition (WP-09-01: trust boundary, assets) and the threat analysis with risk determination (WP-09-02). Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
…aim the rest of clause 9 - The platform security manual claims the cybersecurity goals (WP-09-03), the claims (WP-09-04) and the cybersecurity concept (WP-09-06). Its content already has the assumptions of use and the security concept; the goals are added to its description. - The formal review reports claim the verification of the goals (WP-09-05) and of the concept (WP-09-07). The formal reviews check the analysis and the manual, which is that verification. - The manual claims the requirements for post-development (clause 6.4.9, WP-10-02) and no longer the release work product (WP-06-04), as decided for the security management PR. The formal review line changes the same claim as the security management pull request; the two changes are identical for the manual and the release work product. Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
The work products of clause 9 sit in subsections 9.3.3, 9.4.3 and 9.5.3. The identifiers used the numbering of clauses 6 and 10, which have a work product section of their own; clause 9 has none, so the earlier identifiers were not derivable from the standard's structure. They now follow the structure: 9331 (WP-09-01), 9431 to 9434 (WP-09-02 to WP-09-05), 9531 and 9532 (WP-09-06, WP-09-07). The claims in the analysis, the security manual and the formal review reports follow the rename. Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
The note in the clause 9 section said the claims are made in the work products. The claim for the threat analysis requirement (RQ-09-03) is made in the security analysis guideline, because a work product may only claim work products of the standard. The note now says that. Assisted-by: Anthropic Claude Haiku 5.5 (claude-haiku-5-5)
# Conflicts: # process/process_areas/security_management/security_management_workproducts.rst # process/standards/isosae21434/isosae21434.rst
- Impact per impact category (S, F, O, P) instead of per asset property, safety impact from ISO 26262-3 (RQ-15-04 to RQ-15-06). - Risk value 1 to 5 with the risk matrix of Annex H (RQ-15-16); the earlier scale ended at 4. - Risk treatment decision for every threat scenario (RQ-09-04, RQ-15-17). - Model the clause 15.3 to 15.5 requirements; the platform security analysis claims damage scenarios and impact ratings (WP-15-01, WP-15-04), which are no longer tailored out. - Analysis checklist: remove the duplicate heading, reviewer as in the formal review workflow, claims of the verification requirements. - Branch now based on process_description#2, which removes the merge conflicts. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
…-01, RQ-09-02, RQ-09-08 to RQ-09-10) Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
janis-qorix
changed the base branch from
main
to
ml2-security-management-fdr
November 20, 2026 16:23
Author
|
Superseded by eclipse-score#892 (same content, one clean commit on top of eclipse-score#891). Closing the fork PR. |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Clause 9 (concept) of ISO/SAE 21434 applies at platform level; the item level stays with the system integrator and reaches the platform through the cybersecurity interface (clause 7, see
process_description#2). The platform security analysis gets a risk determination that conforms to clause 15. Qorix fork only; draft, not for eclipse-score yet.This PR is based on
process_description#2(base branchml2-security-management-fdr), so the diff shows only the clause 9 changes and there are no merge conflicts. Merge #2 first; this PR then retargets tomain.Every point below is a proposal for confirmation. Nothing is left open.
Proposals for confirmation
wp__tailoring_work_products; the clause 15.3 to 15.5 requirements are modelled.Checks
bazel run //:docs), on top of docs: Security Management ML2, proposal for confirmation (not for eclipse-score yet) #2.Other PRs in this series
process_description#2: security management (base of this PR).score#6: platform security plan; its tailoring list no longer lists the TARA work products.AI: Claude Code. First version with Claude Haiku 5.5 (claude-haiku-5-5), reviewed and revised with Claude Opus 5.5 (claude-opus-5-5).
🤖 Generated with Claude Code